Technical Reports

Biggars Lane Landfill Operation Timeline chart

Biggars Lane Landfill

2024-11-21T17:35:24+00:00

SSP&A developed analyses to predict the evolution of the concentration of chloride at a compliance boundary downgradient from an existing landfill and proposed new landfill cells.

Groundwater Sampling at the Lane Street Site

Lane Street Ground Water Contamination Site

2024-11-21T22:24:16+00:00

SSP&A was retained by the U.S. Environmental Protection Agency (EPA) Region 5 to evaluate groundwater conditions at the site and to collect environmental media to support the microcosm studies.

Go to Top