Waste Management

Biggars Lane Landfill Operation Timeline chart

Biggars Lane Landfill

2024-11-21T17:35:24+00:00

SSP&A developed analyses to predict the evolution of the concentration of chloride at a compliance boundary downgradient from an existing landfill and proposed new landfill cells.

West Lake Landfill Site RIM Figure

West Lake Landfill Site

2024-11-21T17:46:08+00:00

SSP&A was retained to estimate and depict the lateral extent and the volume of radiologically-impacted material (RIM) within Areas 1 and 2 of Operable Unit 1 (OU-1) at West Lake Landfill Site

Cape Cod Wastewater

Cape Cod Wastewater

2024-11-21T17:50:49+00:00

In support of litigation, SSP&A evaluated the impacts to groundwater and surface water from a wastewater treatment system and septic leach field at a commercial complex in Harwich, Massachusetts.

Otis AFB MMR TCE Concentration Plumes

OTIS AFB MMR Fate-and-Transport Analysis, Modeling, and Remedy Design

2026-01-05T22:45:53+00:00

SSP&A developed and applied a 3D groundwater flow and contaminant transport model for the OTIS/MMR as part of remediation efforts at the site, and was subsequently retained to undertake wide-ranging data analysis, reporting, and remedy evaluation and optimization tasks.

Bannister Federal Complex site photo & Groundwater magazine

Bannister Federal Complex

2025-02-06T19:37:06+00:00

Historical operations at the Bannister Federal Complex had led to extensive contamination with chlorinated solvents, PCBs, hexavalent chromium, and petroleum hydrocarbons.